TUCONE CARGO · LOAD PLANNING

Plan container loads.
Build pallet loads.

Plan your containers and build pallet loads. Review the cargo layout before preparing your shipment.

Verified account · No card required for the trial
TuCone Cargo / ContainersSample load plan
Preparando la vista del mapeo…
48 / 48 boxes placed9,22 m³ of goods1.680 kg of cargo
This example uses the planner’s actual viewer. You can rotate it.View the sample report
20 ft · 40 ft · 40 ft HC containersPallet load plannerLoading reportsProjects saved on your device
TWO TOOLS, ONE OPERATION

Plan from the box
to the container.

Enter dimensions, quantities and constraints. Review the results and share a plan your team can use.

01 / CONTAINERS

Find a layout for your shipment.

Compare three container profiles, combine items and check orientation, stacking, door clearance and payload. Use the viewer and reports to assess the result.

Plan a container load
02 / PALLETS

Arrange your boxes before loading.

Set the pallet base and allowed stacking levels. Compare layouts and transfer the resulting pallets to the container planner.

Plan my pallets
HOW IT WORKS
01

Prepare your data

Outer dimensions, quantity, weight and stacking requirements.

02

Review the layout

Check the layout, warnings and remaining cargo.

03

Share the plan

Save the project on your device and generate loading reports.

View a complete example
FREE RESOURCES

Information for your operations.

Browse without buying a plan. Find references to help with your next shipping decision.

View over shipping containers from a vessel at seaINTERNATIONAL TRADE · TUCONE
SUPPORT FOR YOUR OPERATIONS

From your load plan
to your next shipment.

Tell us the origin, destination and cargo type. Let’s review the support you need with purchasing, documents and logistics coordination.

BEFORE YOU START

The essentials, explained.

What counts as a calculation?

A complete order counts as one calculation, even when it uses several containers. Pallets are calculated separately. Viewing results, changing colours, saving and generating reports do not use calculations.

Where are my projects stored?

Files are saved on your device. Your browser keeps a draft of your current work; download your project to keep a copy and open it later.

How is my plan activated?

Your plan activates when payment is confirmed. Check its price, validity and scope on the Plans page. There is no automatic renewal.

Does the layout guarantee safe loading?

The result is a proposed layout based on the data entered. Check actual dimensions, packaging strength, securing arrangements and equipment condition with those responsible for loading.

Prepare your next load plan.

Start with your cargo dimensions.

Create my account Compare plans